The implementation is done in the following stages

Analysis of business processes and framework of the software functionality
The first stage, which is an analysis of client activity aims to clarify the requirements needed to sistemata.Sled detailed analysis of workflow, ongoing processes in the company and the role of individual employees in their daily work, our specialists analyze business processes and define needs future software.

GAP analysis (model contradiction)
The purpose of this stage is to compare existing ERP16 processes with the processes currently used company – ie To establish differences in their proceedings in both environments. After setting these differences is a plan for actions that aim to unify the model of action system.In the future this stage specifying changes in functionality).

Model and add additional functionality

Following an analysis of the differences start development phase of additional features designed to meet the special requirements in client activity. Parallel to this is provided and ready initial model of the software to familiarize customers with the system. Our aim is to be an active participant in the process.

Test and software installation

After the construction of functionalities proceed to test the system in a real environment. Importing (transfer) data used to date systems and introduces the basic data necessary for the proper working process. At the end of this stage is done test the software.

Training employees to work with the system

During the training, all employees are familiar with the basic functions of softuera.Nablyaga on common cases that can occur during operation and possible issues.
As the system has different levels of access, training can be performed separately for users who occupy the corresponding position.